If you are planning on having a swimming pool installed in your backyard, one thing you could hear from people around you will be about the need to meet codes.

A building code is basically a set of rules that establish the minimum standards for buildings and other non-building structures. The main aim of these codes is to protect the general welfare, health, and safety of the public.

Before your Harding, NJ pool installation process commences, the project must adhere to a lot of legal aspects such as health regulations, building codes, and any other type of laws or regulations with respect to residential pools. Regulations and codes usually happen to be more detailed and complicated for urban areas when compared to that of rural areas or smaller towns. However, when it comes to swimming pool construction, almost all residences should comply with some form of codes or regulations.

If you are planning on hiring a reliable and reputed Harding, NJ pool installation contractor or company to do the job for you, they will be able to take care of most of these legal obstacles on your behalf. However, it is still good to gather as much knowledge about these obstacles as possible to make sure that the cost and design of your pool project goes as planned.

Required Permits

In general, any pool project requires two different types of permits for construction: an electric permit and a building permit. You will be able to receive these from the building department at the local courthouse or city hall. In order to receive the permits, you will be required to submit the plans of your pool project in detail.

Usually, the number of plans to be submitted would be two; however, consult with your Harding, NJ pool installation contractor or the local building department’s authorities directly to know more about the details to be included during the submission. In most cities, the local building departments provide brochures that contain information and answers to all required details.


Once you receive all necessary permits and begin the construction of your pool, the next step would be to have your pool project pass a set of inspections. As your Harding, NJ pool installation contractor will be the one to know the expected completion dates of every stage of the pool construction process, they will be able to schedule these inspections accordingly. When your project passes an inspection, it means that you are issued an approval for the successful progress of your project.

Your local building authorities will issue your permits for what they see in your pool building plans so that it will meet all the applicable building codes. The building codes for pool projects usually indicate aspects such as the thickness of the walls of your pool, depth of footings, size of footings, height of the pool fence, etc. While some building codes are universal, others change from urban locations to rural locations or even from one area to another.

You may come across circumstances where your pool plan infringes certain restrictions. In such cases, especially if you feel that that particular aspect is vital for the plan, you may get a variance, which refers to the permission you receive from the officials to stretch the rules to some extent.

Usually, there will be a review board that grants such variances to homeowners when they explain that complying with specific restrictions will cause them to encounter difficulties, like increased cost, etc.

One of the most important requirements that every contractor or homeowner should meet during Harding, NJ pool installation is to have a temporary pool enclosure. The temporary enclosure can be a permanent fence, a temporary fence, a permanent structure’s wall, or even a combination of the above. While installing a temporary enclosure, you need to make sure that:

  • All parts of the enclosure is a minimum of four feet in height, and
  • All elements of the enclosure are enough to prevent access to the pool by anyone who is not involved in its construction.

The temporary pool enclosure should be installed for the entire Harding, NJ pool installation period and until you have a permanent enclosure installed. It is essential that you have the temporary enclosure replaced by a permanent one after the construction of the pool. In some states, a permanent pool enclosure must be installed within ninety days after the building permit is issued for the pool construction or installation.

Constructing or installing a swimming pool is certainly not an easy process. It involves a lot of steps like these that require early and careful planning, which when done right, will prevent future troubles.